PS280
J11 M60
280,000 sq ft
pre-let to Great Bear Logistics
Click for
live webcam
Strategic
Location
Click for
live webcam

Strategic Location

Great Bear Logistics

280,000 sq ft pre-let to Great Bear Logistics. Completed in March 2016, with Buckinghams as its main contractor, this development acted as a catalyst for the Port Salford Development, and was delivered under the outline planning consent for 1.5 million sq ft of development.

PS280 is a new 280,034 sq ft B2/B8 port and warehouse facility at Junction 11 of the M60.

  • The development will have capacity for 8000 inbound containers PA
  • Significant number of jobs created
  • Close to M60 and M62
  • Total potential development floorspace on broader site
    up to 1.6 million sq ft
  • PS280 is 1st stage 280,000 sq ft pre-let to Culina Logistics

The port is next to the Manchester Ship Canal which is part of the green highway network.

Port Salford will be the UK’s first inland “tri-modal” port facility and Distribution Park; served by road, short sea shipping and connected to the West Coast Main Line via a new link to the 9’6” gauge cleared Manchester – Liverpool line.

Local map
National map
Click for
live webcam

Specifications

Great Bear Logistics
Warehouse280,034 sq ft26,016 sq m
Total280,034 sq ft26,016 sq m
  • Outline consent for B2/B8
  • Total site area of 150 acres
  • Total potential development floorspace 1.6 million sq. ft.
  • Close to M60 and M62 motorways
  • Links to Manchester Ship Canal and on to L2 Deepwater Shipping Terminal
  • Rail Link to West Coast Main Line approved
Click for
live webcam

Additional Downloads